The hottest subsidy is up to 2000 kW, and Guangzho

2022-09-23
  • Detail

The maximum subsidy is 2000 yuan/kW, and Guangzhou released the draft for comments on the subsidy management measures for charging facilities

original title: the maximum subsidy is 2000 yuan/kW, and Guangzhou released the subsidy pipe for charging facilities. 2. Special polyurethane rubber shock absorption suspension structure: the draft for comments on the rational measures with shock absorption effect

tram news: Recently, Guangzhou Bureau of industry and information technology issued the measures for the administration of subsidy funds for electric vehicle charging infrastructure in Guangzhou (Revised Draft for comments), which revised sgxgz [2018] No. 3 document accordingly. Now we are asking for revision opinions from the society

The original text of the policy is as follows:

measures for the administration of subsidy funds for electric vehicle charging infrastructure in Guangzhou (revised exposure draft)

in order to better promote the development of the electric vehicle charging market in our city, fully release the business vitality of the charging facility investment operators in our city, and better improve the charging and replacement service capacity and level of electric vehicles in our city, Our bureau has revised the measures of Guangzhou Municipality for the administration of subsidy funds for electric vehicle charging infrastructure (hereinafter referred to as the measures). In accordance with the provisions of Guangzhou Municipality on the administration of administrative normative documents, we are now seeking public opinions. If you have any modification opinions on the opinions, please put forward your opinions in writing within 10 days from the date of publication of this announcement. For the opinions raised, the specific reasons and basis must be stated, and the real name, contact and mailing address must be provided

Annex: Measures for the administration of subsidy funds for electric vehicle charging infrastructure in Guangzhou (revised exposure draft) Doc

Guangzhou Administration of industry and information technology

March 25, 2020

(contact: Li Min,:, e-mail: gxjdlglc@. Mailing address: Power Management Office of 901 Municipal Administration of industry and information technology, No. 2 Fuqian Road, Guangzhou, postcode: 510030)

Guangzhou electric vehicle charging infrastructure subsidy

fund management measures

Chapter 1 general provisions

Article 1 is to strengthen the charging infrastructure of electric vehicles (hereinafter referred to as "the electric vehicle charging infrastructure") "Charging facilities") to standardize the management of subsidy funds and improve the use performance of financial funds. According to the provisions of the administrative measures for the construction and operation of electric vehicle charging infrastructure in Guangdong Province (Yue FA gainengdian [2016] No. 691), the notice on printing and issuing local financial subsidies for the promotion and application of new energy vehicles in Guangdong Province (Yue FA Gai Ye Han [2018] No. 518) issued by the provincial development and Reform Commission, the Provincial Department of Finance and other departments, These measures are formulated in combination with the actual situation of our city

Article 2 the subsidy fund for electric vehicle charging infrastructure (hereinafter referred to as "subsidy fund") refers to the subsidy (reward) fund for charging facilities arranged by the municipal finance, including the subsidy (reward) fund for charging facilities issued by the superior department, which is used to guide and support the construction and operation of charging facilities (including charging and power exchange facilities) in the city

Article 3 the arrangement of subsidy funds shall follow the principles of fairness, openness and impartiality, law and regulation, highlighting key points, scientific distribution, etc

Article 4 the Municipal Bureau of industry and information technology is responsible for the specific management of the subsidy funds, preparing the subsidy funds budget, organizing or entrusting the project review, organizing the project declaration, issuing the fund plan, and supervising, inspecting and evaluating the implementation of the project and the use of the funds together with the Municipal Bureau of finance

Chapter II support scope and methods

Article 5 subsidy funds are used in the following aspects:

(I) support charging facility construction projects. There is no subsidy for the construction of charging facilities for personal use. In addition to meeting the requirements of the latest general national standards, the subsidy items should also meet the following conditions:

1. Charging facilities should meet the relevant national standards for charging equipment, interface, safety, etc. if there is no national standard or the national standard is not clear, they should meet the relevant provincial and municipal standards

2. the charging facilities must be installed within the administrative region of Guangzhou, and the investor and the builder must ensure that the DC, AC and power exchange facilities subsidized in the current year can operate normally for at least 5 years (from the year of subsidy, including the year of subsidy) on the total power displayed on the intelligent management platform of Guangzhou charging facilities (hereinafter referred to as "the platform"), Among them, the number of AC power can be replaced by the number of DC power in the proportion of 1:5 (that is, 1 kW of DC can replace 5 kW of AC), and the number of AC power can be replaced by the number of converted power in the proportion of 1:25 (that is, 1 kW of power can replace 25 kW of AC) to achieve comprehensive, harmonious and sustainable development, The power of DC can be replaced by the power of power conversion in the ratio of 1:5 (that is, 1 kW of power conversion can replace 5 kW of DC)

if the investment and construction party fails to ensure that the total power displayed on the platform by the subsidized DC, AC and power exchange facilities in that year can be maintained for at least 5 years, it must supplement the power data displayed on the platform within 3 months from the date of receiving the notice from the Municipal Bureau of industry and information technology, Otherwise, the subsidy will be refunded according to the amount obtained by multiplying the subsidy standard in the current year (from first to last) by the power difference and then multiplying by the subsidy return standard (except for the investment and construction party that stops business or goes bankrupt within the five-year duration). If the subsidy is not supplemented and returned, the financial subsidy shall not be applied for again

if the total power of normal operation displayed by the investment and construction party on the platform is less than the total amount of subsidized power for 30 consecutive days, the Municipal Bureau of industry and information technology shall issue a rectification notice to the investment and construction party; If the accumulated 90 days in a year is less than the total amount of subsidized power, it shall be included in the key monitoring and inspection objects

the total power of subsidized DC, AC and power exchange facilities can be transferred, and the transferee must be an independent legal person who has entered information on the platform, and the transferred power shall be implemented in accordance with this regulation

3. For the charging facility construction project registered with the competent department of industry and information technology in the region, the investor and the builder must submit the completion acceptance report to the competent department of industry and information technology in the region after the completion of the project. The completion acceptance report must be carried out in accordance with the code for construction and completion acceptance of electric vehicle charging and replacement equipment (nb/t33004) and other standards

4. The investor of charging facilities construction has entered information on the platform as required, and all charging facilities have been connected to the management platform; The total power of the charging facilities that have been built and are in normal operation within the administrative region of Guangzhou is not less than 5000 kW

(II) support the good operation of charging facilities. There is no subsidy for personal charging facilities, and the operating power subsidy for special and public charging facilities is provided annually, and the following conditions should be met:

1. It can realize the real-time sharing of charging data on the management platform as required, and the electric energy of charging facilities can be measured, the location can be queried, and the charging state can be supervised

2. The charging data collection of enterprises meets the requirements of relevant national, provincial and municipal specifications, and it is necessary to collect and store charging and operation data, and the data storage period is not less than 5 years

3. The enterprise establishes a perfect charging facility operation safety management system to ensure the safe and reliable operation of charging facilities

Article 6 subsidy standards are as follows:

(I) charging facility construction project. A one-time construction subsidy will be given according to the rated output power of charging facilities, and the subsidy objects include DC charging piles, AC and DC integrated charging piles, AC charging piles, wireless charging facilities, power exchange facilities, etc. The subsidy standard is as follows:

1. Charging pile project:

(1) DC charging pile, AC/DC integrated charging pile, wireless charging facilities: the subsidy is based on the standard of 300 yuan/kW

(2) AC charging pile: subsidy according to the standard of 60 yuan/kW

2. Power exchange facility project: subsidy according to the standard of 2000 yuan/kW

(II) for special and public charging facilities, the annual operating electricity subsidy is given, and the subsidy standard is as follows:

according to the subsidy standard of 0.1 yuan/kWh, the average upper limit hours of subsidy per pile in a single charging station is no more than 2000 hours per year, and the average upper limit hours of subsidy per change of electrical position in a single power exchange station is no more than 3000 hours per year

the above subsidy scope and standard can be adjusted according to the annual work tasks and explained in the annual charging facilities subsidy fund declaration notice. In order to encourage the construction of charging facilities in open-air public parking areas in residential communities, the subsidy standard should be appropriately improved compared with charging facilities in other areas

Chapter III Fund declaration and Review

Article 7 the Municipal Bureau of industry and information technology issues a notice on the declaration of subsidy funds for charging facilities every year and publishes it on the portal

Article 8 the subsidy fund items declared by the declaring unit shall meet the following basic requirements:

(I) the declared items shall belong to the scope of subsidy fund support and shall not be declared across the scope

(II) charging facilities that have received construction subsidies shall not be repeatedly declared or declared by multiple parties, but the charging facilities that have received construction subsidies shall be upgraded and transformed, and the newly increased charging power can be declared as construction subsidies

(III) charging facilities used to supplement the difference between the total power of the subsidized charging facilities that must be maintained in normal operation on the platform shall not apply for construction subsidies

(IV) the application materials must be true, accurate and complete, and the application unit must not resort to fraud and obtain or defraud subsidy funds

Article 9 when applying for subsidy funds for charging facility construction projects, the following materials shall be provided:

(I) application report, mainly including the basic information of the applicant, project content, implementation effect, etc

(II) apply for the business license of the legal person of the unit, the audit report of the enterprise in the previous year, and the tax credit rating materials (the copy is stamped with the official seal of the unit)

(III) the certification that the applicant enterprise has entered information on the platform, that the charging facilities have been connected to the platform and the intelligent service platform of electric vehicle charging facilities in Guangdong Province, and that the total power of the charging infrastructure that has been built and normally operated within the administrative region of Guangzhou is not less than 5000 kW

(IV) project registration form (the copy is stamped with the official seal of the unit)

(V) charging equipment purchase contract, equipment invoice (copy with official seal). For the situation that the equipment of the applicant enterprise is self-developed or assembled, and the purchase contract and invoice cannot be provided, the enterprise can provide the purchase contract and invoice of charging infrastructure materials, or the contract, invoice and other related materials processed by entrusted external units

(VI) certification materials of rated output power of charging facilities or installed capacity of replacement power station, etc

(VII) charging infrastructure product certification certificate or type test report with cma/cnas logo issued by the third-party testing and certification authority (copy with official seal of the unit)

(VIII) the completion acceptance report formed by carrying out the completion acceptance work in accordance with the code for construction and completion acceptance of electric vehicle charging and replacement Facilities Engineering (nb/t33004) (the copy is stamped with the official seal of the unit)

(IX) image photos of charging station

(x) the internal safety management system of the applicant (the copy is stamped with the official seal of the unit)

(XI) statement that the applicant is responsible for the authenticity of the application report and the attached materials

when applying for subsidy funds for charging facility operation projects, the materials required to be provided shall refer to this article according to the situation

Article 10 the application for subsidy funds shall be reviewed according to the following procedures:

(I) preliminary review of the project. Each district is responsible for collecting projects, and the competent departments of industry and information technology of each district conduct preliminary evaluation of project application materials